To meet the needs of a nuclear power plant along the route Moscow — to the site of the Kursk NPP in Kurchatov (Kursk region), we carried out the transportation of equipment. We performed the following stages:
1. Preparation
Within the shortest possible time, we arranged the transport and compiled a complete set of documents for access to the NPP facility.
2. Delivery
Route: Moscow — Kurchatov (~650 km). Monitoring: online tracking, photo documentation of loading and unloading.
3. Unloading
At the checkpoint in Kurchatov, the vehicle passed inspection without any issues. The equipment was unloaded at the client's site in the presence of an authorized NPP representative.
Result: The cargo was delivered ahead of the agreed deadline. The equipment was received without damage or any remarks.
1. Preparation
Within the shortest possible time, we arranged the transport and compiled a complete set of documents for access to the NPP facility.
2. Delivery
Route: Moscow — Kurchatov (~650 km). Monitoring: online tracking, photo documentation of loading and unloading.
3. Unloading
At the checkpoint in Kurchatov, the vehicle passed inspection without any issues. The equipment was unloaded at the client's site in the presence of an authorized NPP representative.
Result: The cargo was delivered ahead of the agreed deadline. The equipment was received without damage or any remarks.